Wastewater Treatment Plant Improvements & Cross-Connection Survey

PROJECT # L17-7217 

The Village of Gifford, Illinois is constructing various improvements to the existing wastewater treatment plant. These improvements include installation of a new manual basket screen feature, the refurbishment of lagoon cell #1 level control structure, the refurbishment of lagoon cell #2 level control structure, the replacement of existing blowers, the refurbishment of existing sand filters, miscellaneous valve replacement, and all related appurtenances. These improvements are funded through a loan from the Public Water Pollution Control Loan Program administered by Illinois Environmental Protection Agency (IEPA) under the provisions of the Environmental Protection Act. The total loan is for $1,188,379.41 at the Small Community interest rate of 1.62%. This loan qualifies for Principal Forgiveness in the amount of $356,513.82. Therefore, $831,865.59 will be repaid to the Illinois EPA at the interest rate of 1.62% over 30 years. 

You can also view a PDF of the signage for this project for reference.

Additionally, there is a cross-connection survey form residents can complete regarding their existing plumbing.

For questions or additional information on this project and/or the cross-connection form please contact the Village of Gifford.

Hydrant Flushing

The Village will be flushing the hydrants in town Tuesday (12/16) – Friday(12/19). You will probably experience some temporary discoloration with your water at home. Go ahead and run your water until it clears up. The water is safe to drink. This is the last step to having our new and improved water treatment plant connected. Please share with all family and friends in town that might not be connected to technology. The next water project is our new 150K gallon water tower (previously 50K) that will break ground in the spring. Thank you for all of your patience!